Infrastructure work planned around the building and the operation
New York work rewards early logistics planning. Building access, freight elevators, insurance requirements, after-hours rules, loading and occupied-space protection can affect the schedule as much as the technical scope. We surface those constraints during the survey and coordinate them with the installation plan.
Available scopes include structured cabling, fiber optics, rack installation, IT decommissioning and smart hands.